NVIDIA datacentre roadmap (Rubin to Feynman)

Cross-cuts: MemoryCommunications
· +2 sources in last 30d
Assessmentdraft · unreviewed
Viability
4/5
Drivers
4/5
Novelty
3/5
Diffusion
4/5
Impact
5/5

TimingNow (0-2yr)·ReadFairly rated

HBM (High-Bandwidth Memory)HBM (High-Bandwidth…Optical InterconnectOptical InterconnectNVIDIA da…

NVIDIA’s datacentre roadmap runs from the Vera Rubin platform shipping in H2 2026 to Feynman in 2028, and the July 2026 slip of the Kyber NVL144 rack to 2028 is the first hard evidence that the annual-cadence promise is bounded by packaging and rack engineering rather than by silicon design.

Summary

NVIDIA no longer sells chips on a roadmap; it sells rack-scale platforms on a roadmap. The Vera Rubin platform, launched at GTC 2026 on 16 March, was presented as six new chips forming one AI supercomputer: a Rubin GPU generation paired with the Vera CPU, Spectrum-X networking, and an adjacent LPX rack built around a licensed Groq 3 LPU, fully liquid-cooled, shipping in the second half of 2026 with the first rack live at Microsoft Azure and no CUDA code changes required ref. Rubin uses HBM4, and Feynman was confirmed on the public roadmap for 2028 as far back as GTC 2025, though no TDP figures have been disclosed for either ref.

The roadmap has already been rewritten twice in a year, in both directions. Rubin CPX, announced September 2025 as a prefill-only GPU with 30 PF of NVFP4 and 128 GB of GDDR7 and no HBM, was cancelled in March 2026 and replaced by the ~$20B Groq licensing deal signed 24 December 2025, which produced the Groq 3 LPX SRAM decode co-processor on Samsung 4nm targeted at Q3 2026 ref. In the other direction, SemiAnalysis reported on 5 July 2026 that the Kyber NVL144 rack had slipped more than twelve months to 2028, three months after Jensen Huang demoed it, because the multi-layer PCB midplane connecting compute modules “remains challenging from a manufacturability standpoint”; the NVL72x2 back-to-back double-rack stopgap was cancelled after pushback from cloud service providers over its operational burden ref.

The parameters that decide this roadmap are mostly not logic design. They are: CoWoS advanced packaging supply, where NVIDIA booked roughly 55% of 2026 capacity against lead times of 50 to 104 weeks and where packaging rather than the die is widely argued to be the gating constraint; HBM4 ramp, where NVIDIA has deliberately split allocation to roughly mid-50% SK Hynix, mid-20% Samsung and ~20% Micron, down from about two-thirds SK Hynix in January 2026, and where analysts flagged in July 2026 that HBM4 shipments expected to scale from Q2 “do not appear to have materialised at scale” ref; rack power and thermals, with Rubin Ultra NVL576 racks projected to exceed 600 kW by 2027 and direct-to-chip liquid cooling already mandatory from GB200 NVL72 onward ref; and the manufacturability of the rack itself, which is what killed Kyber’s schedule.

Demand-side, the roadmap is the reference architecture for the largest committed capital programme in the industry: Vera Rubin is rolling out across the Stargate sites in H2 2026 2026 Openai Titan Custom Chip, a build with five new sites, roughly $400B committed over three years and ~7 GW planned on the path to a headline 10 GW and ~$500B 2026 Stargate Expansion 7Gw.

Viability (4/5)

The near-term part is demonstrated rather than promised. The Vera Rubin platform was formally launched on 16 March 2026, ships H2 2026, is fully liquid-cooled, and the first LPX rack is live at Microsoft Azure with no CUDA code changes required ref. Deployment against a named customer programme is also dated: Vera Rubin rolls out across Stargate sites in H2 2026 2026 Openai Titan Custom Chip. That is a high bar of evidence for a compute-architecture page.

The out-years are where the score is capped. Kyber NVL144 slipped more than twelve months to 2028 for PCB midplane manufacturability reasons, and the NVL72x2 fallback was cancelled, leaving NVIDIA with no proven path to expand the scale-up world size for Rubin Ultra, which stays at an NVL72-class domain far longer than roadmapped ref. Rubin CPX was announced then cancelled inside six months. Feynman is on the roadmap for 2028 with no disclosed TDP or configuration ref, and the sources give no independent basis for treating that date as firm. Component supply adds a second constraint: HBM4 volumes had not materialised at scale as of July 2026 ref.

TLDR: Rubin is a shipped, racked, customer-live product; everything past it is a schedule that has already slipped once.

Drivers (4/5)

Demand: the Stargate programme alone accounts for five new sites, ~$400B committed over three years and ~7 GW planned toward a 10 GW / ~$500B headline, with Vera Rubin as the deployed architecture 2026 Stargate Expansion 7Gw 2026 Openai Titan Custom Chip. AI’s share of TSMC’s leading node is reported at 60% of N3 in 2026 rising to 90% in 2027, which is the clearest available signal that this roadmap is absorbing the frontier of foundry capacity rather than competing for a slice of it 2026 Openai Titan Custom Chip. HBM demand growth of ~+70-77% in 2026 and +68% in 2027, with SK Hynix’s 2026 capacity booked out as of October 2025, corroborates from the memory side.

Supply: this is the constrained side. NVIDIA booked roughly 55% of 2026 CoWoS capacity with 50-104 week lead times, and packaging rather than the logic die is widely argued to be the gating constraint. NVIDIA has responded by deliberately widening HBM4 to three suppliers, cutting SK Hynix from about two-thirds to mid-50% and lifting Samsung and Micron, which reduces single-vendor risk but introduces qualification variance across a TSMC-fabbed versus Samsung SF4-fabbed logic base die ref. Power and cooling are a further gate: Rubin Ultra NVL576 racks are projected above 600 kW by 2027 ref, and one analyst report frames the wider $600B+/yr AI infrastructure build as colliding with a grid that cannot deliver.

TLDR: Demand is committed at hundreds of billions; supply of packaging and HBM4 is the thing throttling delivery.

Novelty (3/5)

The sources contain no per-generation performance comparison for Rubin against Blackwell, so any claim of a quantified uplift would be invented. What the sources do support is an architectural change of kind: NVIDIA moved from selling a GPU generation to selling a six-chip rack platform, and it responded to the prefill/decode specialisation threat by licensing a competitor’s decode engine rather than building its own. Rubin CPX, its in-house prefill-only part with 30 PF NVFP4 and GDDR7 instead of HBM, was cancelled in March 2026 and replaced by the ~$20B Groq deal signed 24 December 2025, yielding the Groq 3 LPX SRAM decode co-processor on Samsung 4nm ref. The LPX rack sits alongside Vera Rubin over Spectrum-X and runs with no CUDA code changes ref.

What it is better than: the alternative disaggregated approach, exemplified by the AWS-Cerebras collaboration announced March 2026 pairing Trainium 3 for prefill with Cerebras CS-3 for decode on Bedrock in H2 2026 ref, and by Google’s TPU line, where TPU v9 “Triggerfish” is reported to carry roughly three times the baseline memory using MediaTek 336G SerDes ref. NVIDIA’s differentiator is not raw specialisation but that the specialised part arrives inside a CUDA-compatible rack with no software migration. Against that, the Kyber slip means the one dimension where NVIDIA’s rack architecture was supposed to pull decisively ahead, scale-up world size, is where it now stands still, which SemiAnalysis explicitly calls a rare technical opening for AMD and Google ref.

TLDR: The genuine novelty is absorbing specialised silicon into the incumbent rack, not a quantified generational leap the sources can evidence.

Diffusion (4/5)

The barriers are physical and procurement-side. Direct-to-chip liquid cooling is already required from GB200 NVL72 and Rubin Ultra NVL576 may exceed 600 kW per rack by 2027, which constrains diffusion to sites designed for it ref. CoWoS lead times of 50-104 weeks mean rack availability is set by bookings made up to two years earlier. And customer preference is now a live veto: NVL72x2 was cancelled specifically because of heavy pushback from CSPs and hyperscalers over its odd design and operational burden ref, which shows buyers of this scale will refuse a roadmap step they do not want to operate.

TLDR: CUDA continuity and pre-committed hyperscaler capex remove the usual adoption friction; the barriers are physical, not commercial.

Impact (5/5)

The roadmap is the denominator for the sector. It is the deployed architecture for a ~$400B, ~7 GW programme heading to 10 GW 2026 Stargate Expansion 7Gw 2026 Openai Titan Custom Chip, it consumes roughly 55% of 2026 CoWoS capacity, and NVIDIA’s allocation decisions set the revenue split across the three HBM suppliers, with a single reallocation from two-thirds to mid-50% SK Hynix contributing to a 15.4% one-day fall in SK Hynix on 13 July 2026, the biggest in about two decades ref. Few technologies on this knowledge base have that direct a transmission channel into public markets and foundry allocation.

The slip case shows the same leverage in reverse. Because Rubin Ultra now has no proven path to a larger scale-up domain, one packaging problem on a PCB midplane translates directly into a competitive opening for AMD and Google TPU at the high end ref. Second-order impact runs through customer strategy too: OpenAI’s own Titan chip enters mass production on TSMC N3 with Broadcom in H2 2026, in parallel with Vera Rubin deployment on the same sites 2026 Openai Titan Custom Chip, so the largest buyers are hedging even while adopting.

TLDR: This roadmap sets the unit economics and the schedule of the entire frontier AI build-out.

Timing Now (0-2yr)

The current part is live. Vera Rubin launched 16 March 2026, ships H2 2026, with the first LPX rack already running at Azure and rollout across Stargate in the same window ref 2026 Openai Titan Custom Chip. The Groq 3 LPX decode co-processor targets Q3 2026. So there is nothing speculative about the 0-2 year band.

The interesting timing question is 2028, where two roadmap items now converge: Feynman, confirmed for 2028 with no disclosed specifications ref, and Kyber NVL144, pushed to 2028 by the midplane slip ref. A generation and a rack architecture arriving in the same year, after one of them has already lost twelve months to manufacturability, is a compression risk the sources do not resolve. Also unresolved in the sources: whether HBM4E at 3+ TB/s, timed for 2027, arrives in step with the parts meant to use it.

TLDR: Rubin ships and is racked in H2 2026; the contested part of the roadmap lands in 2028.

Overrated or underrated? Fairly rated

The product is real and the demand behind it is committed capital, not sentiment. Treating Vera Rubin as anything other than the default frontier training and inference architecture for 2026-27 would be wrong: it is launched, racked, liquid-cooled, live at Azure, deploying across Stargate, and it absorbs the phase-specialisation threat via the Groq licence without asking anyone to leave CUDA ref ref.

Where the market rating deserves a discount is the metronome narrative. In roughly nine months NVIDIA cancelled an announced prefill GPU, cancelled a rack stopgap after customer pushback, and lost more than a year on its next-generation rack to a PCB manufacturability problem ref. The binding constraints have moved off the die and onto packaging, midplanes, HBM4 qualification and 600 kW-class thermals ref. Roadmap dates beyond 2027, Feynman included, should be read as intentions with a demonstrated slip rate, not commitments. Net: correctly rated on the shipping generation, over-rated on cadence beyond it.

Prediction

By 31 December 2027, NVIDIA will not have shipped in volume a rack-scale system with a scale-up domain larger than NVL72-class, leaving Rubin Ultra’s world size unexpanded relative to the 2026 roadmap.

Evidence base

Open questions


Assessment drafted 2026-08-31 from up to 15 KB sources using the technology-scorecard framework; scores are a draft read pending review.