Electrolyser materials
Electrolyser components and materials (catalyst-coated membranes, porous transport layers, membranes, coated bipolar plates) sold to electrolyser OEMs
- Bear
- Closing
- $4.1B by 2035
The callGreen hydrogen needs cheaper stacks, but too few electrolysers are being built for a materials supplier to matter; the reachable market is about $90M today.
- D1Green hydrogen is how steel, ammonia and refining decarbonise, and installed electrolysis doubled in 2025 to over 4 GW with 58 GW a year of factory capacity waiting.
- D2PEM stacks depend on scarce iridium and platinum and on fluorinated membranes that PFAS rules threaten, so low-iridium and PFAS-free materials are needed.
- R1Too few electrolysers are built outside China, so the component layer a European startup can reach is about $90M today.
- R2The systems layer has already fallen: Nel's revenue fell 31%, nucera's green-hydrogen orders went from €356M to €26M, and 4.9 Mtpa of capacity was withdrawn in a year.
- R3Each stack qualifies one supplier, the incumbents hold every slice, and listed comps trade below 1x sales.
- C1An EU hydrogen origin rule names a component below stack assembly, membranes or plates made in Europe, protecting the parts as well as the assembly.end-2030
Rests onthe beliefs underneath
Supported by · confidence
What would prove itdated tests, open and resolved
- 1At least one European electrolyser maker announces insolvency, a restructuring with job cuts, or an exit from electrolysers between 6 Nov 2026 and 31 Jan 2027.Jan 2027 · open
- 2The IEA Global Hydrogen Review; a second fall in announced 2030 production would be the signal to retire this.Mar 2027 · open
- 3The Industrial Accelerator Act implementing acts or the fourth European Hydrogen Bank auction terms, and whether either names components.Jun 2027 · open
- 4No European electrolyser component or materials independent is named in a production-volume supply or licence agreement with a Union-origin electrolyser OEM by end-2030.Dec 2030 · open
- 5Non-China annual electrolyser installations remain below 8 GW/yr through 2030, so the component layer never reaches the deployment volume its 2035 sizing requires.Dec 2030 · open
- 6A European component independent signing a production-volume contract with a European-origin stack maker, or installs outside China passing 8 GW a year.Dec 2030 · open
Expressionslisted, private, technologies
- BEKB.BRNV Bekaert SA
- cheap
- CWR.LCeres Power Holdings plc
- expensive
- ITM.LITM Power Plc
- full
- NCH2.DEthyssenkrupp nucera AG & Co. KGaA
- expensive
- NEL.OLNel ASA
- full
- PLUGPlug Power Inc.
- full
- JMAT.LJohnson Matthey
- not screened
- CCChemours
- full
Private · 6 private companies, 2 of them in the US.
M-Spin · Nel Hydrogen · Ionomr Innovations · Bspkl · Versogen · Calicat (formerly H2U Technologies)
Technologies
Who has already bet on itprivate rounds, from public sources
$71M raised by 5 companies, $5M of it in the last three years. Early: Little money in so far; a lead investor would set the pace.
Backed by a strategic investor: Ionomr Innovations, Calicat (formerly H2U Technologies).
- $35MIonomr Innovations Series A-4, Dec 2023 $20M (NGIF Cleantech Ventures, Pallasite Ventures, Shell Ventures) · Series A, Jan 2022 $15M (Shell Ventures, Finindus, Pallasite Ventures)
- $18MCalicat (formerly H2U Technologies)
- Founded 2020
- $15MVersogen Series A, May 2022 $15M (Doosan Corporation, HyAxiom, The Chemours Company)
- $2MM-Spin
- Founded 2024
- $2MBspkl Seed, Apr 2023 $2M (WNT Ventures, Investible, WNT Investor Group)