Semiconductor Test

last updated 2026-08-31

Physics / mechanism

Semiconductor test covers the electrical screening steps that separate functional die from defective ones before and after packaging. In chiplet-based assemblies the conventional gate is Known Good Die (KGD) screening, which establishes pre-assembly functional correctness for each die prior to integration. KGD is a pass/fail functional statement: a die that meets specification at probe is admitted to assembly.

The limitation exposed by chiplet-based artificial intelligence systems-on-chip is that functional correctness at probe carries no probabilistic assurance about reliability lifetime after assembly. Once dies are bonded into a multi-die package, a single latent-defect die can compromise the whole assembly, and the cost of an escape scales with the number and value of the co-packaged dies.

The proposed reformulation, Known Good Reliable Die (KGRD) screening, treats the pre- to post-assembly transition as a constrained inference problem under incomplete pre-assembly observability: the test system must infer a post-assembly reliability property from measurements that only partially observe the mechanisms that will drive field failure. The stated contributions are a Bayesian probabilistic risk model mapping pre-assembly telemetry to post-assembly failure likelihood with a quantified observability bias bound, and a safety-gated decision architecture that yields a provable post-assembly failure probability guarantee. Key parameters in this framing are the observability bias bound (how far the inferred risk can deviate given unobserved mechanisms) and the guaranteed post-assembly failure probability at the gate.

Competitive landscape

The sources support only one comparison: KGD versus KGRD screening. KGD is the incumbent methodology and provides a deterministic functional guarantee before assembly; KGRD is proposed as a probabilistic extension that adds a bounded lifetime-reliability guarantee on top of the functional screen. No data in the supplied source compares KGRD against burn-in, system-level test, or in-field telemetry-based reliability monitoring, and no cost, throughput, or yield figures are given.

Evidence base

Frontier (open questions)

Synthesised 2026-08-31 from 1 KB sources by the resynth pipeline; citations are KB source slugs.

Frontier questions